news center
Production News Express
2024-11-27 views 155
-3d0c2fd1bbaf4ef4ad85047922498573.jpg)
At 8:00 a.m. on November 27th, the 66,000DWT BC "UM MINATO" (under Panama Flag) built by Yangzi-Mitsui Shipbuilding for the Japanese shipowner, was successfully signed and delivered by electronic signature.
"UM MINATO" is the fifteenth vessel delivered by Yangzi-Mitsui this year. The vessel measures 199.99 m in length overall, 36.00m in moulded width, 18.45m in moulded depth, a design draft of 11.20m, and was built in accordance with the rules and regulations of class NK.
-b07aeabb0eaa4b4d8b7b646be82a6b9b.jpg)
At noon on November 27th, "UM MINATO" departed from the wharf of the shipyard, delivered and put into operation. The shipowners and representatives of the shipyard gathered at the wharf to witness her maiden voyage.
2026.03.26
Delivery of 32,000 DWT Great Lakes Bulk Carrier "HEMUS" buil…
2026.03.16
Delivery and Departure of the fourth 75,000 DWT Oil Tanker "…
2026.02.13
Delivery and Departure of the second 50,000 DWT Oil Tanker "…
2026.02.11
Delivery of the first 83,300 DWT CABU Combination Carrier "B…
2026.02.07
Delivery of the first 9000TEU Methanol dual-fuel Container V…
2026.01.23
Successful Conclusion of 66,000 DWT Bulk Carrier built by Ya…
2026.01.19
Delivery of 66,000 DWT bulk carrier "UBON NAREE" built by Ya…
2026.01.13
Delivery and Departure of 50,000 DWT Oil Tanker "DELOS T" bu…
2026.01.12
Delivery and Departure of 50,000 DWT Oil Tanker “PAROS STAR…
2026.01.11
Delivery and Departure of 114,000 DWT Oil Tanker "LUCKNAM" b…