news center
Production News Express
2025-04-10 views 157
-11ac25def62b479b93ba13dec1cd0041.jpg)
On the morning of April 10, the 50,000DWT MR tanker "DINO" built by our group's New Yangzi Shipbuilding for the shipowner Evalend was delivered and departed from the shipyard wharf for operation.
The vessel measures 183m in length overall, 174.5m in length between perpendiculars,32.2m in moulded breadth, 19.1m in moulded depth, design draft of 11.0 m, and scantling draft of 13.30m. Equipped with an open-loop U type scrubber, the vessel meets the EEDI Phase III standards. The vessel, which is the fourth of six vessels in series, cut the first plate in April, 2024, and was built in accordance with the rules and regulations of class LR.
-946481f931bd49e282137ef91504f78c.jpg)
On April 8, "DINO" was signed for delivery.
2026.03.26
Delivery of 32,000 DWT Great Lakes Bulk Carrier "HEMUS" buil…
2026.03.16
Delivery and Departure of the fourth 75,000 DWT Oil Tanker "…
2026.02.13
Delivery and Departure of the second 50,000 DWT Oil Tanker "…
2026.02.11
Delivery of the first 83,300 DWT CABU Combination Carrier "B…
2026.02.07
Delivery of the first 9000TEU Methanol dual-fuel Container V…
2026.01.23
Successful Conclusion of 66,000 DWT Bulk Carrier built by Ya…
2026.01.19
Delivery of 66,000 DWT bulk carrier "UBON NAREE" built by Ya…
2026.01.13
Delivery and Departure of 50,000 DWT Oil Tanker "DELOS T" bu…
2026.01.12
Delivery and Departure of 50,000 DWT Oil Tanker “PAROS STAR…
2026.01.11
Delivery and Departure of 114,000 DWT Oil Tanker "LUCKNAM" b…